BS50O, BS60A, BS60R, BS70A, BS75A, BS75R, BS80A, BS80R, BS90A, BS100A, BS113A Rail
- Product Details
- Company Profile
BS50O, BS60A, BS60R, BS70A, BS75A, BS75R, BS80A, BS80R, BS90A, BS100A, BS113A Rail is the main component of railway track. Its role is to guide the wheel of the rolling stock forward, withstand the huge pressure of the wheel, and transferred to the sleeper.
BS50O, BS60A, BS60R, BS70A, BS75A, BS75R, BS80A, BS80R, BS90A, BS100A, BS113A Rail is the main component of railway track. Its role is to guide the wheel of the rolling stock forward, withstand the huge pressure of the wheel, and transferred to the sleeper.
BS50O, BS60A, BS60R, BS70A, BS75A, BS75R, BS80A, BS80R, BS90A, BS100A, BS113A Rail is mainly used as transportation railway rail for heavy vehicle, and it can be also used in underground mining and crane industry. BS50O, BS60A, BS60R, BS70A, BS75A, BS75R, BS80A, BS80R, BS90A, BS100A, BS113A Rail is widely used in the railway track system. Together with the cooperation with the railroad switch, BS50O, BS60A, BS60R, BS70A, BS75A, BS75R, BS80A, BS80R, BS90A, BS100A, BS113A Rail can make trains running without turning to the other directions. In general,BS50O, BS60A, BS60R, BS70A, BS75A, BS75R, BS80A, BS80R, BS90A, BS100A, BS113A Rail is consist of two parallel steel tracks and lays steadily on the railway sleepers. With the development of railway industry, the steel is widely used in the industry. Compared with other materials, the steel have a larger tolerance to bear more weight. BS50O, BS60A, BS60R, BS70A, BS75A, BS75R, BS80A, BS80R, BS90A, BS100A, BS113A Rail can disperse the weight of the steel tracks and keep the stability of the railway transportation. The stones under the steel tracks can supply a elasticity to the railroad tracks. During the common life, the steel tracks can lay on the base made of concrete and even can be embedded into concrete. Steel rail also can called railway track, steel railway track, etc. Steel rail is a metal groove or ridge that holds, guides, and reduces friction for a moving device or apparatus. It's paved with strip steel route for driving the train, trolley, etc.The standard steel rail usually composed by two joint bars, rails fixed to the sleepers, rail pad under the sleepers for the road, including roadbed, rail connection parts, etc.
BS50O, BS60A, BS60R, BS70A, BS75A, BS75R, BS80A, BS80R, BS90A, BS100A, BS113A Rail can provide a continuous, smooth, and least resistance rolling surface for wheels. In electrified railway or automatic block sections, BS50O, BS60A, BS60R, BS70A, BS75A, BS75R, BS80A, BS80R, BS90A, BS100A, BS113A Rail can also be used as track circuits.BS50O, BS60A, BS60R, BS70A, BS75A, BS75R, BS80A, BS80R, BS90A, BS100A, BS113A Rail can be used as cheap rails for a disposable line, for example, if you need to move equipment in a factory, but the equipment is too heavy to be properly transported by car, you can use BS50O, BS60A, BS60R, BS70A, BS75A, BS75R, BS80A, BS80R, BS90A, BS100A, BS113A Rail to build a temporary line.
Shanghai Bosheng Industries Co., Ltd pays great attention to quality control and management. Our BS50O, BS60A, BS60R, BS70A, BS75A, BS75R, BS80A, BS80R, BS90A, BS100A, BS113A Rail is completely controlled by iso9001-2008 quality system, and we have obtained the production license of railway products from The Ministry of Railways of China. We have a full set of testing equipment to ensure that all of our rail products meet customer requirements.
Shanghai Bosheng Industries Co., Ltd is an ISO 9001/2008 certified company. All processes are in accordance with the requirements of ISO quality management system, from supplier quality control to finished products, we are in accordance with the standard procedures, we have strict quality control system for suppliers:
1. Before producing BS50O, BS60A, BS60R, BS70A, BS75A, BS75R, BS80A, BS80R, BS90A, BS100A, BS113A Rail, we will check and test the raw materials. we require suppliers to provide production batch number, chemical composition, mechanical properties and other testing indicators.
2. Our quality control inspectors take sample sampling and batch testing after the process of manufacturing BS50O, BS60A, BS60R, BS70A, BS75A, BS75R, BS80A, BS80R, BS90A, BS100A, BS113A Rail, and provide raw material certificate and other means to control the testing process.
3.According to the different requirements of BS50O, BS60A, BS60R, BS70A, BS75A, BS75R, BS80A, BS80R, BS90A, BS100A, BS113A Rail, we make the corresponding physical and chemical testing and inspection. If the results do not meet our requirements, we will refuse to accept the materials only if they meet our standards.
4. For semi-finished products and their external suppliers of BS50O, BS60A, BS60R, BS70A, BS75A, BS75R, BS80A, BS80R, BS90A, BS100A, BS113A Rail, we often organize quality control coordination meetings and provide technical advice and guidance. Ensure that qualified products are delivered to our customers prior to shipment.