MENU
China Chamber of Commerce

Overseas Economic and Trade Zones

Confirm
Cancel
x

Ok
x
Sign into your account
Member ID or Email
Join Free
prefab steel structure manufacturing
prefab steel structure manufacturing
prefab steel structure manufacturing
prefab steel structure manufacturing
prefab steel structure manufacturing
prefab steel structure manufacturing

prefab steel structure manufacturing

Manufacturer,Scientific Researcher,Engineering Contracting Company

  • Product Details
  • Company Profile

The company has strong technical force, advanced production equipment and excellent processing technology. It has more than 90 million yuan of fixed assets such as machinery and equipment. The main equipment configuration is: two automatic production lines for H-beam, one production line for box girder, one production line for steel pretreatment, and one production line for color steel profiled plate. The annual production capacity of H-beam per shift can reach more than 40000 tons, and the annual production capacity of steel pretreatment can reach 120000 tons. One plastic window and one aluminum alloy window production line with an annual production capacity of 100000 square meters. The company has successively signed contracts with foreign-funded enterprises such as Hyundai Iron Making Co., Ltd., Hyundai Kia Automobile Group Co., Ltd., Sanyo (Zhuzhou) of Japan, Metso Paper Machinery Co., Ltd. of Finland and other domestic well-known enterprises, such as CSCEC, CCCC and China Railway, signed contracts on the processing of steel components, construction of industrial workshops, production of marine supporting products and large-scale public facilities. The main construction projects include the first to fourth phase of Hyundai Weiya automobile engine project, the first to third phase of modern pevotai transmission project, the first to second phase of modern daimosi automobile transmission project, the first to the fourth phase of Ruirong machinery, the first to the second stage of ataike, the third factory of Mobis module in Yancheng, the third factory of Dyk engine, the first phase of Rongda material trade, the solar electronics, danahe tool factory, Japan According to the B-type bonded logistics park, Lianyungang B-type bonded logistics park, Rizhao Xinge aluminum f

1. Modern Jiangsu Dyk three factory project


The factory building of the project is 170 meters long and 140 meters wide, with a building area of 36941.04 square meters and an integral steel truss structure.


2.

Phase I project of Yancheng Ruirong Machinery Co., Ltd


The workshop is 190.48m long, 140.48m wide, with a building area of 26654.61m2 and cornice height of 8.0m. It is an integral portal steel frame structure


Send Inquiry to This Supplier

  • Title
  • From*
  • toAmy
  • Message*
  • Minimum Order Quantity*
  • Unit
  • Verification Code*