MENU
China Chamber of Commerce

Overseas Economic and Trade Zones

Confirm
Cancel
x

Ok
x
Sign into your account
Member ID or Email
Join Free
belt conveyor system fram steel structure
belt conveyor system fram steel structure
belt conveyor system fram steel structure
belt conveyor system fram steel structure
belt conveyor system fram steel structure
belt conveyor system fram steel structure

belt conveyor system fram steel structure

Manufacturer,Scientific Researcher,Engineering Contracting Company

  • Product Details
  • Company Profile

RPIC Steel structure engineering company is a branch of Rizhao Port Shipbuilding Machinery Industry Co., Ltd., which was established in February 2004. The factory is located at No. 589, Linyi South Road, covering a total area of more than 360 mu, with 5 specialized processing workshops and 290 million yuan of fixed assets. At present, it mainly focuses on the construction of industrial plants, the processing of industrial projects, the production and installation of special equipment such as doors and windows curtain walls and pressure pipes. It has the construction qualifications of grade I professional contracting of steel structure, grade II of professional contracting of architectural decoration engineering, grade II of professional contracting of building curtain wall engineering, BG1 of pressure pipeline, BG1 (Special PE project) and GB2 (2) GC2. The company has strong technical force, advanced production equipment and excellent processing technology. It has more than 90 million yuan of fixed assets such as machinery and equipment. The main equipment configuration is: two automatic production lines for H-beam, one production line for box girder, one production line for steel pretreatment, and one production line for color steel profiled plate. The annual production capacity of H-beam per shift can reach more than 40000 tons, and the annual production capacity of steel pretreatment can reach 120000 tons. One plastic window and one aluminum alloy window production line with an annual production capacity of 100000 square meters.

1. Lanshan Port pipe belt machine double line truss processing project


The total length of the project is 6.6 km, the total steel consumption is 3900 tons, a total of 261 truss products are disassembled and welded, the workshop production is 45 days, and the field installation only takes 30 days.


2.Dalian Hengli petrochemical pipe rack processing project


The project order processing capacity of 1800 tons, on schedule high quality delivery, highly praised by customers


Send Inquiry to This Supplier

  • Title
  • From*
  • toAmy
  • Message*
  • Minimum Order Quantity*
  • Unit
  • Verification Code*