MENU
China Chamber of Commerce

Overseas Economic and Trade Zones

Confirm
Cancel
x

Ok
x
Sign into your account
Member ID or Email
Join Free
Steel Structure Engineering
Steel Structure Engineering

Steel Structure Engineering

Manufacturer,Scientific Researcher,Engineering Contracting Company

  • Product Details
  • Company Profile

Hyundai Jiangsu DYK Third Factory Project

The project is located in the Yancheng Economic Development Zone of Jiangsu Province, with a construction area of 26941.04mf, a floor of 24073.57m, and a second floor of 2674.47m. The main body of the workshop is a single-storey building, and the local auxiliary building is a second floor. The total construction period is 210 days. The project adopts an independent foundation under the column. It is 170 meters long and 140 meters wide. The height of the lower frame of the workshop roof is 8,0m. The wide room is the whole. Frame structure, the office area is welded H-beam.


Send Inquiry to This Supplier

  • Title
  • From*
  • toAmy
  • Message*
  • Minimum Order Quantity*
  • Unit
  • Verification Code*