The lowest price,hand asphalt floor milling machine,heavy duty powerful bush hammer,with the best qu
- Product Details
- Company Profile
Description applicable to high ways, railway deck,public,engineering and concrete pavement chiseled,mended,reinforced. In the process of using,it improve the working efficiency and the quality,to achieve the uniform roughness in working face,to promote the service life and safety factor.The head is high quality tungsten steel,high hardness,high hitting quality.
Weight: | 110kg |
Hit: | 17*2200 times /min |
Displacement: | 3m³/6kg |
Chisel feather diameter: | 35mm |
Hair cutting width: | 410mm |
Chiseling capacity: | 15-50Square meter/h |
Chiseling depth: | 3-10mm |
The above-mentioned scabbling capability is refers to the value of concrete strength between the C30-C40. The active degree of the concrete strength and the cutting burr, chiseling efficiency will differ.
Description
applicable to high ways, railway deck,public,engineering and concrete pavement chiseled,mended,reinforced.
In the process of using,it improve the working efficiency and the quality,to achieve the uniform roughness in working face,to promote the service life and safety factor.The head is high quality tungsten steel,high hardness,high hitting quality.
Main applications
1, chiseled concrete pavement surface smooth and anti-slip layer to increase adhesion.
2, highway. Railway bridges and culverts multi-angle cutting hair, increase the adhesive force between the old and the new joint surface.
3, any angle of the plane, elevation, top surface, such as the subway tunnel construction and maintenance of cutting hair.
4, hydraulic concrete dam, pier, tunnel and other construction culvert reinforcing chiseling power.
5, the nuclear industry reactors chiseling jobs.
6, runway tire mark removal, improve runway friction.
7, chiseled concrete dam weathered dock marina, carbonized layer, easy pouring concrete acne and secondary reinforcement.
8, Plaza Mayor, overpasses, plazas, parking lots, concrete floor or marble floor slip cutting hair.
9, removal of offshore platforms, deck, hull paint removal and other rust stains and other chemicals in order to extend its life.
10, steel slag chute cutting hair.
11, underwater body needs reinforcement work cutting hair.
12.A variety of concrete reinforcement work cut high, leveling, before the second pavement cutting hair.