 Manual Beverage Gable-Top Carton Filling Machine
 Manual Beverage Gable-Top Carton Filling Machine
 Manual Beverage Gable-Top Carton Filling Machine
 Manual Beverage Gable-Top Carton Filling Machine

Manual Beverage Gable-Top Carton Filling Machine

Member Details

Shenyang Beiya Beverage Machinery Co.,Ltd

Shenyang,Liaoning,China

Manufacturer

  • Product Details
  • Company Profile

Professional 15 years experience Manufacture of carton filling machine with CE Certification,including gable top carton and brick carton,for filling milk,juice,yogurt,cream,liquid egg,mineral water,seasoning,beer.99.99% Precise in filling volume,competitive price with stable quality.

 


1. Work flow:
1) Carton Forming part: Put the cardboard onto the mandrel (manually) -- Bottom performing -- Bottom heating -- Bottom sealing
2) Capping part: Put the cap into and the carton's capping hole (manually) -- Ultrasonic welding -- Top Open Carton with Cap
3) Top performing part: Top preforming
4) Filling part: Put the carton to the filling part (manually) -- Rationing filling -- Filled Top Open Carton with Cap
5) Top sealing part: Top heating -- Top sealing
6) Date printing part: Date printing -- Finished Product

2. Suitable for filling:

Milk, yogurt, cream, beaten egg, soy milk, juice, tea drink, corn drink, pure water, sauce, wine, spices, cleaning solution, chemical product, sugar, grain, cornmeal, other dry powder, etc.

3.
Technical parameter:

1. Capacity: 250--1000ml (can be filled by one machine)
2. Output: 400-500 cartons/hour
3. Packing material: Cardboard carton / aluminium foil carton
4. Filling temperature: Cold filling: 2-50 degC / hot filling 88-92 degC
5. Cap: With cap (Optional)
6. Overall power: 15KW (three phases of electricity)
7. Size: (L*W*H):
1.6m*1.2m*1.8m
8. Compressed air pressure: 0.8-1.0 Mpa, Flow rate: ≥ 0.4M3/min, without oil, water and dust
9. Cooling water: Flow volume: ≥ 20L/ min Temperature: Normal temperature
10. Net Weight: 500kg
11. Installation requirement: Any smooth floor, such as cement, floor tile, plastic ground, etc. Do not need to make angle.

 

4. Payment terms

 1)T/T : 30% as deposit , 70% balance before shipment

 2) L/C at sight

 

5. Delivery time

  1) For automatic filling machine 60 days

  2) For semi-automatic filling machine 45 days

  3) For manual filling machine 30 days

 

6. After Sale Services

Shenyang Beiya Beverage Machinery Co.,Ltd will supply 12 months guarantee for all the equipments, and if customer need, we will send our technicians to customers’ factory, install the machines and train customer's staff to operate the machine. we will supply all the spare parts with cost price if customer need.

Send Inquiry to This Supplier

  • Title
  • From*
  • toAlan Chiong
  • Message*
  • Minimum Order Quantity*
  • Unit
  • Verification Code*